Profile and position
Place the part in the agreed free or supported state. Measure the marked outline and opening positions from the drawing datum. Record the method and readings.
Quality & inspection / define acceptance
Agree the datum, viewing face and support condition before checking a trial part. Record the outer profile, critical openings and edge observations against the same drawing revision.

Place the part in the agreed free or supported state. Measure the marked outline and opening positions from the drawing datum. Record the method and readings.
Inspect a named straight edge, corner or narrow strip at the agreed magnification and lighting. Record residue, discolouration or visible layer separation at that location.
If a liner or backing must remain, identify the layer and inspection face. Check against the agreed sample, and record layer condition separately from dimensional results.

01 / Start with the drawing
Give each critical feature a clear reference. The six topics below connect a film drawing to the requirements that need agreement.
Define the external and internal contours that determine fit. Use the actual drawing requirements for lengths, widths, diameters, radii and local steps.
A correctly sized opening also needs a defined location. Relate holes, slots and window arrays to the specified outline, locating features or drawing references.
Identify the edge regions and visual conditions that matter. Discuss local notches, protrusions, residues, discoloration and distortion using agreed observation conditions.
State which narrow borders, connecting bridges and uncut areas must remain. Their dimensions and integrity should be connected to identified drawing features.
Identify the intended result for every layer present during processing. A requested intact liner or protected underlying layer requires an evaluation and a suitable verification method.
Connect the inspected workpiece to the right material, orientation and revision. Define relevant handling conditions and identify visible damage or distortion to be reviewed.
Window size, relative location and retained borders.
Explore this partInner and outer contours, locating holes and narrow rings.
Explore this partActive openings, orientation and protected regions.
Explore this partFrame width, internal cut-outs and connecting bridges.
Explore this part02 / Make the conditions clear
A useful comparison starts with a shared definition of the feature and the workpiece state. Record the relevant conditions alongside the requirement.
03 / Look at the defined region
Describe what needs to be observed, where to look and the conditions used to judge it. Reference images or samples can clarify an appearance requirement.
Identify local notches, protrusions, residue or discoloration to review. Define the relevant area and acceptance reference rather than relying on “clean edge” alone.
Describe the appearance requirementReview opening boundaries, narrow connecting regions and retained edges against the drawing. Mark where a local feature could affect fit or handling.
Describe the appearance requirementName the observation face and identify folds, distortion or other visible conditions of concern. Record the workpiece state and the handling conditions used.
Describe the appearance requirementUse these illustrated features to define appearance checks. Material properties and assembly performance require separate verification.
04 / Requirements to checks
Agree the inspection scope before committing to a processing order. The stages below are planning topics; checking frequency and document requirements depend on the project.
| Stage | Requirements to resolve | Scope to agree | Record to request |
|---|---|---|---|
| Requirements review | Material, drawing revision, laser operation, critical features and applicable acceptance references. | Feature list, checking method, workpiece conditions and required records. | An agreed inspection brief and identified open points. |
| Sample evaluation | Which sample features need evidence before the next step. | Sample identities, number of samples, features checked and review responsibilities. | Sample results, observations and any revisions to resolve. |
| In-process checks | Which characteristics need checks during processing. | Relevant stages, quantity or frequency, and the response to an identified concern. | The process-check records specifically agreed for the order. |
| Before dispatch | Final checking scope and the information to accompany the parts. | Selected features, quantity / identity checks and agreed delivery documentation. | Order-linked records and any required inspection summary. |
A request for batch sampling or checking every part needs an agreed scope and method. State the features, quantity or frequency and any specified sampling plan. No universal percentage or automatic full-inspection commitment is implied here.
Confirmation of specified film dimensions and appearance is distinct from functional validation of a finished circuit, sensor, battery or heater assembly. Define the customer’s assembly checks separately.
05 / Evidence with a reference
Use consistent feature IDs so that a result can be traced back to the requirement it addresses. Request the report contents and format that your project needs.
| ID | Requirement | Result | Decision / reference |
|---|---|---|---|
| F01 | [Profile dimension, unit and tolerance] | [Measured value] | [Status and method] |
| F02 | [Location relative to the stated reference] | [Measured value] | [Status and reference] |
| F03 | [Agreed edge appearance criteria] | [Observation] | [Status and image ID] |
Link the record to the correct part, material, sample or order and drawing revision.
Show the feature requirement and the measured value or observation using consistent units and references.
Identify the checking method and the conditions needed to interpret the result. Reference relevant images where agreed.
Record linkage and metrological traceability are different. Part and batch references identify what was checked. A claim of metrological traceability requires supporting information about the measurement result and calibration chain; a calibrated instrument alone does not establish that claim. NIST guidance on measurement traceability.
Materials and process records
Use the process reference with a sample ID, material grade, drawing revision, equipment identification and inspection result. A complete record includes the specified feature, measured result, method and acceptance decision.
The available parameter entries contain settings, not dimensional or edge-inspection results. Ask for the evidence needed for your particular part.
06 / Changes and open points
Keep the material, drawing and inspection requirements aligned. Define the action and confirmation needed when a requirement changes or a result needs review.
Record the changed drawing revision, grade, thickness, adhesive, liner or processing scope. Identify the affected features and samples.
Link the observation to a feature ID, requirement and inspection condition. Identify what is known and what still needs confirmation.
Determine the relevant review, additional evaluation or revision. Record the agreed disposition and approval before treating an unresolved result as accepted.
07 / A practical inspection handover
Copy the template and fill in the known requirements. Keep feature IDs consistent across the drawing, reference images and requested records.
Mark unknown items as “to be confirmed”. Requested methods, checking frequency and records remain subject to project review and agreement.
08 / Before you send the drawing
Clarify the requirements that affect your part and the evidence needed for your next decision.
Provide the actual feature, material, drawing revision and tolerance. The checking method and achievable processing result need separate confirmation for that part. Machine positioning, repeatability or camera resolution figures do not by themselves establish a finished-part tolerance.
The checking scope, quantity or frequency must be agreed for the project. Identify whether you need sample checks, batch sampling or checks on every part, and which characteristics are involved. This page does not promise automatic full inspection for every order.
Yes—describe the feature IDs, units, drawing revision and report fields you need. The supported checks, document contents and format must be confirmed before the processing order is agreed. The example above illustrates a record structure; it is not a completed report.
Identify the edge region and observation face. Provide any defined limits, reference photographs or samples, along with relevant viewing conditions such as lighting and magnification. Terms such as “clean” or “smooth” need a shared acceptance reference.
State any required support, fixing or tension condition. The appropriate arrangement depends on the actual material, feature and measurement method. The agreed inspection condition should be recorded so that results can be interpreted consistently.
Describe the complete construction, the target cut and the required retained condition. Both processing suitability and a suitable verification method need review. A view of the top surface alone may not establish every underlying layer condition.
Approval of the agreed film geometry, positions and appearance has a defined scope. It does not by itself validate the electrical, thermal, mechanical or service performance of a completed customer assembly. Those requirements belong in the relevant assembly validation plan.
Identify the changed revision, grade, thickness, adhesive, liner or other relevant condition. Review the affected processing and inspection requirements, and confirm whether further samples or checks are needed before relying on an earlier result.