Singapore · LUMENFUTURE
Headquarters and processing factory
LUMENFUTURE is our Singapore headquarters and operates a processing factory. Contact the Singapore team about PI film profiles, coverlay openings and process evaluation.
About / Southeast Asia projects
LUMENFUTURE is headquartered in Singapore. Our factories in Singapore, Thailand and Vietnam all provide PI film laser processing.
Laser processing only. Material flow, evaluation, receiving details and delivery arrangements are confirmed for the actual project.
Headquarters and processing factory
LUMENFUTURE is our Singapore headquarters and operates a processing factory. Contact the Singapore team about PI film profiles, coverlay openings and process evaluation.
Processing factory
BESCHOO operates our processing factory in Thailand and accepts PI film laser work. Reach the team by telephone or LINE to discuss materials, drawings and sample arrangements.
095 349 7949 · LINEProcessing factory
Our Vietnam company is CÔNG TY TNHH LKCNC TECH, with a business background in laser cutting equipment and technical service. The Vietnam factory also accepts PI film processing. Use the company telephone for business enquiries or contact the PI processing team directly.
PI film project contact
0358 227 560Vietnam company telephone · +84 367 717 580 (0367 717 580)
LKCNC company website · lkcnclaser.com
Before dispatching film or samples, confirm the receiving address, recipient and sample requirements with the team handling your project.
01 / Preparing regional enquiries
Singapore-based LUMENFUTURE, together with our BESCHOO factory in Thailand and LKCNC factory in Vietnam, offers drawing-based cutting of yellow, white and black PI film and coverlay openings for Southeast Asia.
02 / Prepare a connected brief
Start with the information available. Mark anything still unknown and distinguish the technical processing requirement from the material and delivery arrangements.
Part identity, drawing revision, units and the laser features to produce.
Product code, layer sequence, thicknesses, adhesive or liner, and incoming form.
Initial discussion, sample evaluation, a batch project or a repeat enquiry.
Separate sample and batch quantities. State whether you mean pieces, sheets or panels.
Where the material would be dispatched from, its availability and the intended supply arrangement.
Destination country or city, required output format and the date the parts are needed.
03 / Material arriving for evaluation
A useful material shipment can be matched to the intended work. Confirm what is needed, where it is going and how the sample will be identified before sending it.
Share its specification, dimensions, available quantity, incoming condition and the associated drawing.
Identify the question to resolve, suitable material format and quantity needed for the agreed checks.
Confirm the receiving address, contact, transport responsibilities and information to accompany the material before dispatch.
Connect the sample ID to the material and drawing revision. Mark relevant faces and orientation, and agree protection for the actual workpiece.
Discuss the processed samples, unused stock and remaining material: what is returned, retained or otherwise handled, and under which arrangements.
Confirm a receiving address and shipping instructions before sending material.
04 / Reviewing the project at a distance
Use identifiable documents, samples and observations to discuss the result. Agree the evidence needed and keep open questions separate from confirmed requirements.
| Review topic | Keep the reference | Clarify the decision |
|---|---|---|
| Drawing questions | Current revision, marked feature or location, and the question being discussed. | Identify the intended requirement and any change to the drawing. |
| Material questions | Material code, actual layers, thicknesses, faces and orientation. | Connect the incoming construction to the requested cut or retained layers. |
| Sample feedback | Sample ID, matching drawing, agreed checks and observations. | Distinguish accepted results from open questions or proposed revisions. |
| Appearance discussions | The area shown, image reference, viewing conditions and feature of concern. | Agree how appearance is assessed; dimensions and other criteria follow the agreed checking method. |
| Next-step decisions | The confirmed references, unresolved items, responsible contact and next action. | Identify what must be supplied, reviewed or confirmed before the affected work proceeds. |
Photographs can support discussion of appearance and location. Dimensions and other acceptance criteria follow the agreed checking methods. Images, inspection records, sample return and other supporting material must be included in the agreed project scope where required.
05 / Preparing the material flow
Incoming material and processed-part delivery are separate arrangements. Identify each movement and the information needed for its handover.
Confirm the dispatch location, material identity and amount, receiving details and transport responsibilities.
Confirm the destination, receiving organization, output format and the documents or records included in the work.
Discuss separated parts, sheets, panels or retained carriers. Confirm pack quantities and their counting basis.
Identify surfaces, edges, openings and locating features that need protection, together with part and revision labels.
Confirm the destination, receiving organization, contact and any applicable receiving requirements.
Agree who arranges transport, how costs are confirmed, the accompanying information and the relevant responsibilities.
Transport method, carrier, shipment documents and customs arrangements are discussed for the actual movement. Confirm the relevant parties and requirements before dispatch; no standard transit time or duty-inclusive service is specified here.
Discuss the intended delivery06 / From a requested date to an agreed plan
Share when the parts are needed. The project plan must account for preparation, confirmation and the relevant material movements as well as processing.
Resolve missing or conflicting requirements.
Confirm the actual stock and its availability.
Where needed, agree dispatch and receipt.
Allow for agreed trials, feedback and changes.
Arrange the work to the confirmed scope.
Complete agreed checks and shipment preparation.
Follow the confirmed transport arrangements.
Connect the delivered parts to the agreed references.
Processing completion, dispatch and receipt are different milestones. Unresolved requirements, material readiness, feedback and changes can affect the plan. A target arrival date remains a request until the applicable arrangements are confirmed.
Share your target arrival dateThe quotation and shipment discussion should identify the work and arrangements included, with any conditions still to be resolved.
Processing · Evaluation · Agreed checks · Packaging · Incoming transport · Outgoing transport · Other applicable charges
Actual amounts, responsibilities and commercial terms are confirmed for the project.
07 / Continuing a regional project
Reference the earlier project and current requirements. An unchanged part does not automatically mean the destination, packing or timing is unchanged.
Discuss a repeat shipment08 / Before you enquire
Use these answers to prepare the material and delivery discussion. Technical requirements belong with the drawing, stack and agreed processing scope.
Explore the complete FAQ guideYes. Begin with the drawing, material information and the question you need to resolve. The review establishes whether physical material is needed and what should be arranged before dispatch.
Receiving details are confirmed through the project discussion after the evaluation needs are reviewed. Check the address, contact, quantity and accompanying information before sending anything. Review the sample arrangements.
Specify them separately in the enquiry, including any different organizations or contacts involved. The feasible material flow, responsibilities and shipment arrangements need to be confirmed for the project.
Agree the intended return or handling of processed samples and remaining material before evaluation. Confirm quantities, destination, transport responsibility and any applicable arrangements.
Share the destination, required arrival date, material readiness and project stage. The schedule also depends on open technical questions, evaluation and confirmation needs, processing and transport. A requested date is not a confirmed commitment.
Reference the earlier project and current drawing and material versions. Recheck the quantity, packing, identification, records, receiving details and required arrival date. Prepare the repeat-project information.