Resources / Inspection planning guide

PI film inspection
planning guide.

Define the feature.
Agree the evidence.

Prepare inspection requirements for your laser-cut PI film parts. Connect each critical feature to its drawing reference, acceptance criteria, inspection conditions and requested records.

Rectangular features visible on the workshop observation screen.
01 Identify02 Define03 Agree04 Record

Laser processing requirements / Project-specific review

01 / Establish the reference set

Start with the
correct references.

An inspection request needs a recognizable part, a current requirement and a clear connection to the material or samples being discussed. Keep missing information visible.

Connect the requirement to the correct part
ReferenceWhat to includeWhy it matters
Part & drawingPart name or number, drawing revision, date and units.The requirements must correspond to the intended version.
Material & inspected stateProduct reference, layer construction and the state in which the part will be checked.A loose film, liner-backed piece and attached workpiece need clear descriptions.
Sample / order relationshipSample IDs, batch or order reference, and project stage.Identify the actual items covered by the request.
Acceptance referencesCustomer specification, relevant clause, approved reference image or sample ID and revision.Keep the basis of each requirement recognizable.
Unresolved differencesConflicting revisions, missing tolerances or uncertain sample relationships.Record the question and obtain clarification before treating an assumption as agreed.

02 / Connect the drawing to a check

Choose the features
that matter.

Identify the features important to fit, location, retained regions or handling. The example below connects six topics to a film part; use the actual references and requirements on your drawing.

Six inspection topics on a film partConcept drawing with profile, window, edge, bridge, layer and output references F01 to F06. The references are examples and must be replaced with those on the actual drawing. Highlighted topics do not indicate inspection results. REFERENCE VIEW / SIDE AILLUSTRATIVE GEOMETRY · NOT TO SCALE F01 F02 F03 F04 F05 ACTUAL LAYER STATE PART / REVISIONSAMPLE / ORDER ID F06 EXAMPLE FEATURE IDs / USE THE REFERENCES ON YOUR ACTUAL DRAWING

F01 / Example inspection topic

Profile & dimensions

Outer profiles, inner contours, diameters and local steps.

Prepare: Identify the actual dimension, units, applicable tolerance and drawing revision. Say which layer boundary is being measured.

Explore insulation spacers & washers

F02 / Example inspection topic

Holes & window positions

Windows, holes or slots located relative to named references.

Prepare: Record the reference features, viewing face and the location requirement on the drawing. A size requirement alone does not define position.

Review coverlay reference requirements

F03 / Example inspection topic

Edges & appearance

Specified edge regions, surface areas and visible conditions.

Prepare: Identify the area, observation conditions and the accepted reference. Explain whether the concern is a local notch, residue, discoloration or another defined observation.

Describe an edge appearance requirement

F04 / Example inspection topic

Borders & bridges

Narrow frame borders and connections that must remain.

Prepare: Mark the region, applicable width or other geometry, and the required retained condition. Connect handling concerns to the same feature reference.

Explore frames & custom profiles

F05 / Example inspection topic

Cut & retained layers

The required condition of the PI, adhesive, liner or another layer.

Prepare: List the layer-specific request and the question to verify. A top-view image may not establish every retained-layer condition; agree an appropriate evaluation method.

Define the material states

F06 / Example inspection topic

Output & identification

Part orientation, separation state and correspondence to the order.

Prepare: Describe whether parts are separate or retained in a sheet, and what identity, orientation and handling information is needed.

Describe the required output

A selected-check list describes the requested inspection scope. It should not silently remove other applicable drawing requirements.

03 / An inspection working sheet

One feature.
A complete requirement.

“Check the window position” leaves important questions open. The example below shows the information needed to turn that request into a useful inspection discussion.

F02

Example only / replace with actual references

Coverlay window position

REQUIREMENTS
TO DEFINE
A complete feature request — no measured results
FieldWhat to record
Drawing featureF02 — the indicated coverlay window. Replace with your actual feature ID.
RequirementWindow location as defined on the current drawing, including its units and applicable tolerance.
Reference & faceIdentify the actual datum holes or edges and whether the view is from Side A or another named face.
Workpiece conditionDescribe the layers present and the relevant support or fixing condition during inspection.
Acceptance sourceState the drawing revision and any applicable customer specification clause.
Proposed methodRecord the requested method, or “to be discussed” when it is not yet defined.
Stage & quantityIdentify the project stage, actual samples or parts, and requested checking quantity or frequency.
Required evidenceSpecify the relevant results and any annotated image or record format needed.
Open questionsKeep unresolved datums, observation conditions, method suitability or decision rules visible.

This worksheet describes required information. It does not assign datums, tolerances, a method or acceptance results to your part.

Build your own inspection item records

04 / Make results interpretable

Define the condition
before comparing results.

Describe the inspected state and the conditions relevant to the feature. These details help both parties discuss the same boundary, face and requirement.

Name the face and datums.Concept illustration of an inspection condition to describe. This does not prescribe equipment, a fixture, a tension level or a measured result.NAMED DATUMS / VIEWING FACESIDE A
01 / Reference

Name the face and datums.

Specify the viewing face and the holes, edges or other references used to interpret the requirement.

Identify the inspected state.Concept illustration of an inspection condition to describe. This does not prescribe equipment, a fixture, a tension level or a measured result.WHICH LAYERS ARE PRESENT?WHICH BOUNDARY IS MEASURED?
02 / Construction

Identify the inspected state.

Describe all relevant layers and the boundary to which a dimension or retained-condition request applies.

Describe the support.Concept illustration of an inspection condition to describe. This does not prescribe equipment, a fixture, a tension level or a measured result.FREE FILM / DEFINED SUPPORTRECORD THE RELEVANT CONDITION
03 / Workpiece

Describe the support.

Record the relevant support, fixing or restraint. These sketches do not prescribe a fixture or tension.

Agree a suitable method.Concept illustration of an inspection condition to describe. This does not prescribe equipment, a fixture, a tension level or a measured result.METHOD / LIGHT / VIEW / RECORD
04 / Observation

Agree a suitable method.

Record the proposed method and relevant lighting, magnification, background or other observation conditions.

For a tight requirement or a result close to a limit, agree method suitability and how the decision will be made. Instrument resolution or calibration information alone should not be used to infer a finished-part acceptance capability.

NIST explains that metrological traceability does not automatically establish fitness for a particular measurement need; the associated uncertainty also matters. Read NIST’s measurement traceability guidance. This reference explains a measurement principle, not our equipment capability or certification.

05 / Replace broad requests with clear criteria

Make the acceptance
criteria clear.

Connect each requested check to a specific requirement and its source. Keep dimensional criteria, visual references and retained-layer questions distinct.

Replace a broad statement with a defined requirement
Broad requestInformation to add
“The dimensions must be accurate.”Name each dimension, its units, applicable tolerance, reference features and drawing revision.
“The edges must be clean.”Identify the edge region, condition of concern, observation conditions and acceptance reference.
“The window must not be offset.”Identify the reference features and the actual position requirement.
“The liner must not be damaged.”Describe the required retained condition and discuss a suitable way to verify it for the actual stack.
“Inspect every part.”Identify the characteristics to inspect on each part, the proposed method and required record scope.
“Use the previous report.”Identify the report and revision, relevant fields and changes needed for this order.
REGION
Where to look
CONDITIONS
How to observe
REFERENCE
What defines the requirement

Reference photographs should have an identity, version and clear purpose. Images can support an agreed appearance requirement; they do not by themselves establish every dimensional, material or retained-layer condition.

Turn edge appearance into a clear requirement

06 / Stage, quantity and characteristic

Agree when and
how much to inspect.

Separate the number of items, the checking frequency and the features covered. State the requested arrangement so it can be reviewed for the actual project.

Separate the stage, quantity and feature scope
StageQuestions to agreeScope reference
Sample evaluationWhich question should the trial resolve, and which samples and features need evidence?Sample IDs, selected features and the requested evaluation record.
Initial production confirmation, if requiredWhich initial pieces and requirements need review before the next production step?Defined quantity, characteristics and review responsibility.
During processingWhich characteristics need checks at specified stages or intervals?The relevant stage, quantity or frequency and action when a concern is found.
Before dispatchWhat final checking and identification are needed for this order?Selected features, checking scope and agreed accompanying records.
After a changeWhich previous requirements or evaluations need review?Changed material, drawing, stack or processing scope and affected features.

If a sampling plan is specified.

Provide the standard or document and revision, lot definition and size, inspection level, defect classification and applicable acceptance or rejection provisions. Include the other conditions needed to interpret that plan.

If every part needs a check.

Name the characteristics, proposed method and record scope. The feasible checking arrangement, timing and charges need review. No universal sampling percentage or automatic full-inspection commitment is implied.

Define the sample evaluation questions

07 / Connect evidence to the requirement

Specify the evidence
you need.

A useful record connects the requirement, result and context to the same feature and sample. Request the fields and format needed for your project; available records must be confirmed for the order.

An inspection record structure to discuss
Record elementFields to request
IdentityPart number, drawing revision, material, sample or batch reference, record ID and date.
RequirementFeature ID, requirement, units and the source document or clause.
Result or observationMeasured value or the recorded observation for the identified feature and item.
Method & conditionsMethod identity and conditions needed to interpret or compare the result.
Images & supporting recordsImage or attachment references linked to the same feature and sample.
Review & decisionThe agreed decision basis, review information, unresolved points and relevant disposition.

Blank record structure / illustrative fields

Result, observation and decision are separate fields
Feature / sampleRequirement sourceResult / observationReview / decision
[Feature ID] / [Sample ID][Drawing or specification revision / clause][Value + unit, or observation + image reference][Agreed decision basis / reviewer / unresolved point]

Blank report example. Replace bracketed entries with the agreed checks and results.

Measurement

The recorded value and units for an identified feature and item.

Observation

A description or image reference under the recorded conditions.

Decision

A conclusion under the agreed criteria, with open points kept visible.

See how inspection records link to the drawing

08 / Keep the next action specific

Review differences.
Keep the references aligned.

If a requirement changes or inspection results differ, first identify the affected feature and record. Keep an unresolved result visible while the relevant checks and next action are agreed.

  1. 01

    Identify the item.

    Confirm the actual part, sample, drawing revision and material construction.

  2. 02

    Compare the conditions.

    Review the feature boundary, datums, face, support, method, units and acceptance basis.

  3. 03

    Record the difference.

    Link the observation to its requirement, result or image, and state what still needs clarification.

  4. 04

    Agree the next action.

    Identify the review, additional evaluation or revision needed and the responsible party. Record the agreed disposition.

Review changes before reusing an evaluation

09 / Prepare the project discussion

Build your inspection
requirements brief.

Organize the references and add a record for each requested check. Copy the full brief or link it to the enquiry below without replacing your contact details or project description.

Your inspection working sheet

Requirements ready for discussion.

Status labels describe information preparation, not product acceptance or an approved inspection plan. Entries are local to this page and are not saved after a reload.

0 of 6 topics reviewed.

01Project referencesNot reviewed

Connect this request to the correct part, drawing, material and samples.

02Inspection itemsNot reviewed

Add one record for each requirement you want to discuss. Keep your drawing feature IDs separate from the list order.

One record for each requirement.

The displayed order is separate from your item reference and drawing feature ID. Reordering a record keeps both of those references intact.

01 Inspection item

1 inspection item

03Inspection conditionsNot reviewed

Describe the state and conditions used to interpret the requested checks.

04Quantity & stagesNot reviewed

Separate how many items, when to inspect and which features are covered.

05Records & referencesNot reviewed

Define the evidence and the references that should accompany it.

06Open questionsNot reviewed

Keep missing information, differences and review responsibilities explicit.

All six topics and every current inspection item are included, even when collapsed. Your item references and drawing feature IDs stay unchanged when records are reordered.

Use this brief in my enquiry

10 / Before you share the requirements

Inspection planning
questions.

Do I need an inspection requirement for every dimension?

Identify the characteristics needing particular attention and the checking scope you want to discuss. The applicable drawing requirements still need to be retained. A list of selected checks should not silently remove other requirements from the drawing.

What if my drawing has no tolerance for a feature?

Identify the feature and check whether an applicable general tolerance or customer specification exists. If the requirement remains undefined, mark it as an open point. Do not invent a tolerance or assume one from the laser equipment specification.

Can a reference photo define an appearance requirement?

A reference photo can help when its identity, region, revision and observation conditions are clear. Agree what the photo is intended to establish and any accompanying criteria. A photograph alone may not resolve all material, dimensional or retained-layer requirements.

Can you inspect every part?

Specify which characteristics need a check on every part, the quantity, proposed method and required records. The executable scope, timing and charges need project review. “Every part” does not by itself define every characteristic or every required check.

How should a retained liner or protected layer be checked?

Describe the actual construction and required retained condition, then discuss an appropriate verification method. State whether any proposed evaluation could alter the sample and whether separate evaluation specimens are available. A top-view photograph may not establish every layer condition.

What information should I provide for a sampling plan?

If a plan is specified, include its standard or document and revision, lot definition and size, inspection level, defect classification and applicable acceptance or rejection provisions. Include other conditions needed to interpret the requested plan. Otherwise, mark the checking scope for discussion.

What should an inspection report contain?

Connect the part, drawing revision and sample or order identity to each feature requirement, result or observation, method, relevant conditions and supporting references. Identify the format and review information you need; the available record scope must be agreed for the order.

What happens if our inspection results differ?

First confirm that the same part, revision, feature boundary, reference face and inspected state were used. Compare the methods, conditions, units and acceptance basis, then record the difference and agree the next review or evaluation step. Keep unresolved results visible until an appropriate disposition is agreed.

Explore related questions in the complete FAQ guide →

PI FILM LASER PROCESSING

Explore the website

Find the information for your PI film project.