Quality & inspection / define acceptance

Inspecting a
laser-cut PI part

Agree the datum, viewing face and support condition before checking a trial part. Record the outer profile, critical openings and edge observations against the same drawing revision.

Rectangular features visible on the workshop observation screen.
01

Define the feature

02

Agree the checking method

03

Connect the result to the drawing

Three checks for a trial piece

Profile and position

Place the part in the agreed free or supported state. Measure the marked outline and opening positions from the drawing datum. Record the method and readings.

Edge condition

Inspect a named straight edge, corner or narrow strip at the agreed magnification and lighting. Record residue, discolouration or visible layer separation at that location.

Retained layers

If a liner or backing must remain, identify the layer and inspection face. Check against the agreed sample, and record layer condition separately from dimensional results.

A dark contour running along a straight section and around a rounded corner.

01 / Start with the drawing

Identify the features
that matter.

Give each critical feature a clear reference. The six topics below connect a film drawing to the requirements that need agreement.

Six numbered features on a PI film inspection drawingIllustrative inspection-planning drawing. No measured dimensions, acceptance limits or inspection results are shown.PART FEATURES / INSPECTION PLANNINGLayers / actual stackF01F02F03F04F05F06REFERENCE VIEW / SIDE A · NOT TO SCALE
F01 / INSPECTION TOPIC

Profile & dimensions

Define the external and internal contours that determine fit. Use the actual drawing requirements for lengths, widths, diameters, radii and local steps.

Provide
Feature IDs, drawing units, nominal dimensions and applicable tolerances. Identify critical features explicitly.
Agree
Which contour or boundary is measured, the relevant references and a suitable checking method.
F02 / INSPECTION TOPIC

Hole & window location

A correctly sized opening also needs a defined location. Relate holes, slots and window arrays to the specified outline, locating features or drawing references.

Provide
Hole-to-edge, hole-to-hole or window-to-reference requirements and the viewing direction.
Agree
The reference features, alignment convention and how relative position will be assessed.
F03 / INSPECTION TOPIC

Edges & appearance

Identify the edge regions and visual conditions that matter. Discuss local notches, protrusions, residues, discoloration and distortion using agreed observation conditions.

Provide
Areas of concern, appearance references and any defined limits or customer specification.
Agree
Viewing face, lighting, magnification where relevant and the basis for judging an observation.
F04 / INSPECTION TOPIC

Retained regions

State which narrow borders, connecting bridges and uncut areas must remain. Their dimensions and integrity should be connected to identified drawing features.

Provide
Retained-area boundaries, minimum widths or other specified geometry, and handling requirements.
Agree
How the relevant dimensions and local condition will be checked for the actual film construction.
F05 / INSPECTION TOPIC

Layer condition

Identify the intended result for every layer present during processing. A requested intact liner or protected underlying layer requires an evaluation and a suitable verification method.

Provide
Layer sequence, target cut-through layers, retained layers and the required post-process condition.
Agree
Processing feasibility, what can be verified and the agreed observation or test method. A top-view image alone may not resolve every layer condition.
F06 / INSPECTION TOPIC

Handling & identification

Connect the inspected workpiece to the right material, orientation and revision. Define relevant handling conditions and identify visible damage or distortion to be reviewed.

Provide
Reference face, workpiece state, support requirements, part ID, drawing revision and sample or batch reference.
Agree
Inspection condition and how the records will be linked to the actual samples or order.

02 / Make the conditions clear

Define how each feature
will be measured.

A useful comparison starts with a shared definition of the feature and the workpiece state. Record the relevant conditions alongside the requirement.

Drawing references and viewing faceIllustrative inspection-planning drawing. No measured dimensions, acceptance limits or inspection results are shown.Reference faceSide A01 / DATUMS, VIEW AND FEATURE IDS
Free-film and defined support conditionsIllustrative inspection-planning drawing. No measured dimensions, acceptance limits or inspection results are shown.Free-film stateDefined support condition02 / SUPPORT, FIXING AND TENSION
Identify the layers present during inspectionIllustrative inspection-planning drawing. No measured dimensions, acceptance limits or inspection results are shown.PI filmExisting adhesiveLiner, if presentIdentify the construction during inspection.03 / MATERIAL STATE AND LAYER BOUNDARY
01
Drawing & feature definitionUse the applicable revision, units and feature IDs. Specify the contour, edge or boundary intended by each dimension.
02
References & viewing directionIdentify the relevant holes, edges or faces, and state whether the view is from Side A or the opposite face.
03
Incoming and inspected stateState whether the film is separate, adhesive-backed, on a liner or attached to another component.
04
Support, fixing & tensionAgree the relevant support and handling condition. Note any specified restraint or tension instead of assuming a freely laid film.
05
Method & suitabilityConfirm the instrument or observation method and its suitability for the feature and tolerance. Equipment specifications alone do not establish finished-part acceptance.
06
Conditions & recordInclude relevant environmental or conditioning requirements when the customer specification calls for them. Record the method and conditions needed to interpret the result.

Read equipment specifications in context

03 / Look at the defined region

Agree edge and
appearance criteria.

Describe what needs to be observed, where to look and the conditions used to judge it. Reference images or samples can clarify an appearance requirement.

Edge feature and residue locations to defineIllustrative inspection-planning drawing. No measured dimensions, acceptance limits or inspection results are shown.Local edge featureResidueILLUSTRATIVE FEATURES / NO ACCEPTANCE LIMIT
01 / ILLUSTRATIVE FEATURES

Cut edges

Identify local notches, protrusions, residue or discoloration to review. Define the relevant area and acceptance reference rather than relying on “clean edge” alone.

Describe the appearance requirement
Window boundaries and a retained connecting bridgeIllustrative inspection-planning drawing. No measured dimensions, acceptance limits or inspection results are shown.Retained bridgeOPENING BOUNDARIES AND NARROW REGIONS
02 / ILLUSTRATIVE FEATURES

Openings & retained borders

Review opening boundaries, narrow connecting regions and retained edges against the drawing. Mark where a local feature could affect fit or handling.

Describe the appearance requirement
Viewing face and a local distortion featureIllustrative inspection-planning drawing. No measured dimensions, acceptance limits or inspection results are shown.Viewing faceLocal distortionSURFACE / HANDLING FEATURES TO REVIEW
03 / ILLUSTRATIVE FEATURES

Surface & handling condition

Name the observation face and identify folds, distortion or other visible conditions of concern. Record the workpiece state and the handling conditions used.

Describe the appearance requirement
VIEWFace and inspection region
CONDITIONSLighting and magnification, if needed
REFERENCEAgreed image, sample or specification
RECORDFeature ID and observation

Use these illustrated features to define appearance checks. Material properties and assembly performance require separate verification.

Read: Turn “a good edge” into a clear requirement.

04 / Requirements to checks

Build an inspection plan
for your part.

Agree the inspection scope before committing to a processing order. The stages below are planning topics; checking frequency and document requirements depend on the project.

For each selected check, define its method, quantity or frequency, acceptance basis and required record. Scroll horizontally on small screens.
StageRequirements to resolveScope to agreeRecord to request
Requirements reviewMaterial, drawing revision, laser operation, critical features and applicable acceptance references.Feature list, checking method, workpiece conditions and required records.An agreed inspection brief and identified open points.
Sample evaluationWhich sample features need evidence before the next step.Sample identities, number of samples, features checked and review responsibilities.Sample results, observations and any revisions to resolve.
In-process checksWhich characteristics need checks during processing.Relevant stages, quantity or frequency, and the response to an identified concern.The process-check records specifically agreed for the order.
Before dispatchFinal checking scope and the information to accompany the parts.Selected features, quantity / identity checks and agreed delivery documentation.Order-linked records and any required inspection summary.

Define sampling explicitly.

A request for batch sampling or checking every part needs an agreed scope and method. State the features, quantity or frequency and any specified sampling plan. No universal percentage or automatic full-inspection commitment is implied here.

Keep the approval scope clear.

Confirmation of specified film dimensions and appearance is distinct from functional validation of a finished circuit, sensor, battery or heater assembly. Define the customer’s assembly checks separately.

Prepare a feature-by-feature inspection request

05 / Evidence with a reference

Connect inspection records
to the drawing.

Use consistent feature IDs so that a result can be traced back to the requirement it addresses. Request the report contents and format that your project needs.

PART INSPECTION / RECORD STRUCTUREEXAMPLE LAYOUT
NO MEASURED RESULTS SHOWN

Part / drawing revision[Part ID] / [Revision]

Material / construction[Product code and layer stack]

Sample / order reference[Sample or batch / order ID]

Inspected state[Reference face / support condition]

Method / instrument[Confirmed method and identity]

Record / date[Record ID] / [Date]

F01, F02 and F03 correspond to the example record rowsIllustrative inspection-planning drawing. No measured dimensions, acceptance limits or inspection results are shown.F01 / profileF02 / locationF03 / edgeDRAWING REFERENCES / NO DIMENSION VALUES
Feature IDs match the adjacent illustration. Bracketed fields are placeholders, not results.
IDRequirementResultDecision / reference
F01[Profile dimension, unit and tolerance][Measured value][Status and method]
F02[Location relative to the stated reference][Measured value][Status and reference]
F03[Agreed edge appearance criteria][Observation][Status and image ID]

Identity & revision

Link the record to the correct part, material, sample or order and drawing revision.

Requirement & result

Show the feature requirement and the measured value or observation using consistent units and references.

Method & context

Identify the checking method and the conditions needed to interpret the result. Reference relevant images where agreed.

Record linkage and metrological traceability are different. Part and batch references identify what was checked. A claim of metrological traceability requires supporting information about the measurement result and calibration chain; a calibrated instrument alone does not establish that claim. NIST guidance on measurement traceability.

Connect sample findings to the next decision

Materials and process records

Connect a process entry to an inspected part

Use the process reference with a sample ID, material grade, drawing revision, equipment identification and inspection result. A complete record includes the specified feature, measured result, method and acceptance decision.

  1. Process reference
  2. Material and drawing revision
  3. Sample and measurement method
  4. Result and acceptance decision

The available parameter entries contain settings, not dimensional or edge-inspection results. Ask for the evidence needed for your particular part.

06 / Changes and open points

Review changes.
Resolve open points.

Keep the material, drawing and inspection requirements aligned. Define the action and confirmation needed when a requirement changes or a result needs review.

  1. 01

    Identify the affected requirement.

    Record the changed drawing revision, grade, thickness, adhesive, liner or processing scope. Identify the affected features and samples.

  2. 02

    Make the open point specific.

    Link the observation to a feature ID, requirement and inspection condition. Identify what is known and what still needs confirmation.

  3. 03

    Agree the next action.

    Determine the relevant review, additional evaluation or revision. Record the agreed disposition and approval before treating an unresolved result as accepted.

07 / A practical inspection handover

Prepare your
inspection brief.

Copy the template and fill in the known requirements. Keep feature IDs consistent across the drawing, reference images and requested records.

Mark unknown items as “to be confirmed”. Requested methods, checking frequency and records remain subject to project review and agreement.

Explore all project preparation resources

Build the complete inspection requirements brief

08 / Before you send the drawing

Quality & inspection
questions.

Clarify the requirements that affect your part and the evidence needed for your next decision.

What tolerances can you inspect and confirm?

Provide the actual feature, material, drawing revision and tolerance. The checking method and achievable processing result need separate confirmation for that part. Machine positioning, repeatability or camera resolution figures do not by themselves establish a finished-part tolerance.

Are all parts inspected?

The checking scope, quantity or frequency must be agreed for the project. Identify whether you need sample checks, batch sampling or checks on every part, and which characteristics are involved. This page does not promise automatic full inspection for every order.

Can I request dimensional inspection records?

Yes—describe the feature IDs, units, drawing revision and report fields you need. The supported checks, document contents and format must be confirmed before the processing order is agreed. The example above illustrates a record structure; it is not a completed report.

How should I specify edge appearance?

Identify the edge region and observation face. Provide any defined limits, reference photographs or samples, along with relevant viewing conditions such as lighting and magnification. Terms such as “clean” or “smooth” need a shared acceptance reference.

How are flexible films supported during measurement?

State any required support, fixing or tension condition. The appropriate arrangement depends on the actual material, feature and measurement method. The agreed inspection condition should be recorded so that results can be interpreted consistently.

Can retained liners or underlying layers be checked?

Describe the complete construction, the target cut and the required retained condition. Both processing suitability and a suitable verification method need review. A view of the top surface alone may not establish every underlying layer condition.

Does sample approval validate my finished assembly?

Approval of the agreed film geometry, positions and appearance has a defined scope. It does not by itself validate the electrical, thermal, mechanical or service performance of a completed customer assembly. Those requirements belong in the relevant assembly validation plan.

What happens when the drawing or material changes?

Identify the changed revision, grade, thickness, adhesive, liner or other relevant condition. Review the affected processing and inspection requirements, and confirm whether further samples or checks are needed before relying on an earlier result.

Explore related questions in the complete FAQ guide →

PI FILM LASER PROCESSING

Explore the website

Find the information for your PI film project.