About / Southeast Asia projects

PI film laser-processing
projects for
Southeast Asia.

LUMENFUTURE is headquartered in Singapore. Our factories in Singapore, Thailand and Vietnam all provide PI film laser processing.

Laser processing only. Material flow, evaluation, receiving details and delivery arrangements are confirmed for the actual project.

Three factories for direct project discussions

Singapore · LUMENFUTURE

Headquarters and processing factory

LUMENFUTURE is our Singapore headquarters and operates a processing factory. Contact the Singapore team about PI film profiles, coverlay openings and process evaluation.

+65 8466 0116

feedback@wklaser.com

Thailand · BESCHOO

Processing factory

BESCHOO operates our processing factory in Thailand and accepts PI film laser work. Reach the team by telephone or LINE to discuss materials, drawings and sample arrangements.

+66 95 349 7949

095 349 7949 · LINE

abduallah@wklaser.com

Vietnam · LKCNC

Processing factory

Our Vietnam company is CÔNG TY TNHH LKCNC TECH, with a business background in laser cutting equipment and technical service. The Vietnam factory also accepts PI film processing. Use the company telephone for business enquiries or contact the PI processing team directly.

PI film project contact

+84 358 227 560

0358 227 560

xli474408@gmail.com

CÔNG TY TNHH LKCNC TECH

Vietnam company telephone · +84 367 717 580 (0367 717 580)

LKCNC company website · lkcnclaser.com

Vietnam contact addresses

  1. Số 07 Đường DA8, Khu dân cư Viet Sing, Thuận Giao, Hồ Chí Minh
  2. Tầng 5, Nhà B4/D21, Khu đô thị mới Cầu Giấy, Phường Cầu Giấy

Before dispatching film or samples, confirm the receiving address, recipient and sample requirements with the team handling your project.

Southeast Asia target markets: Vietnam, Thailand and MalaysiaA simplified geographic map highlights Vietnam, Thailand, and the peninsular and Borneo portions of Malaysia. Numbered labels identify target markets, not company facilities or shipping routes.01Vietnam02Thailand03MalaysiaSELECTED MARKETS / GEOGRAPHIC OVERVIEW
Target markets shown; markers do not represent offices, facilities or shipping routes. Geographic outlines: Natural Earth.

01 / Preparing regional enquiries

One project.
Several locations.

Singapore-based LUMENFUTURE, together with our BESCHOO factory in Thailand and LKCNC factory in Vietnam, offers drawing-based cutting of yellow, white and black PI film and coverlay openings for Southeast Asia.

  • Different people: engineering, procurement and receiving contacts may have different roles.
  • Different locations: material origin and the final delivery destination may be different.
  • One connected brief: keep the technical references, quantities and timing requirements together.

02 / Prepare a connected brief

The part. The material.
The destination.

Start with the information available. Mark anything still unknown and distinguish the technical processing requirement from the material and delivery arrangements.

01

Part & drawing

Part identity, drawing revision, units and the laser features to produce.

02

Material construction

Product code, layer sequence, thicknesses, adhesive or liner, and incoming form.

03

Project stage

Initial discussion, sample evaluation, a batch project or a repeat enquiry.

04

Quantities

Separate sample and batch quantities. State whether you mean pieces, sheets or panels.

05

Material origin

Where the material would be dispatched from, its availability and the intended supply arrangement.

06

Delivery requirement

Destination country or city, required output format and the date the parts are needed.

03 / Material arriving for evaluation

Agree the sample arrangements
before dispatch.

A useful material shipment can be matched to the intended work. Confirm what is needed, where it is going and how the sample will be identified before sending it.

  1. 01

    Describe the material.

    Share its specification, dimensions, available quantity, incoming condition and the associated drawing.

  2. 02

    Agree the evaluation needs.

    Identify the question to resolve, suitable material format and quantity needed for the agreed checks.

  3. 03

    Confirm receiving arrangements.

    Confirm the receiving address, contact, transport responsibilities and information to accompany the material before dispatch.

  4. 04

    Identify and protect the sample.

    Connect the sample ID to the material and drawing revision. Mark relevant faces and orientation, and agree protection for the actual workpiece.

  5. 05

    Agree what happens afterwards.

    Discuss the processed samples, unused stock and remaining material: what is returned, retained or otherwise handled, and under which arrangements.

Illustrative film sample and reference labelAn amber film sample is shown beside a paper tag with blank reference lines. It illustrates identification rather than a specific packing method.ILLUSTRATIVE SAMPLE / IDENTIFICATION REFERENCE
Project reference
[Project / sample ID]
Material / product code
[Material reference]
Drawing revision
[Current file / revision]
Sample quantity
[Amount and counting basis]
Face / orientation
[Reference face / direction]
Contact reference
[Agreed project contact]

Confirm a receiving address and shipping instructions before sending material.

04 / Reviewing the project at a distance

Keep remote reviews
tied to clear references.

Use identifiable documents, samples and observations to discuss the result. Agree the evidence needed and keep open questions separate from confirmed requirements.

Information that helps connect remote feedback to the work.
Review topicKeep the referenceClarify the decision
Drawing questionsCurrent revision, marked feature or location, and the question being discussed.Identify the intended requirement and any change to the drawing.
Material questionsMaterial code, actual layers, thicknesses, faces and orientation.Connect the incoming construction to the requested cut or retained layers.
Sample feedbackSample ID, matching drawing, agreed checks and observations.Distinguish accepted results from open questions or proposed revisions.
Appearance discussionsThe area shown, image reference, viewing conditions and feature of concern.Agree how appearance is assessed; dimensions and other criteria follow the agreed checking method.
Next-step decisionsThe confirmed references, unresolved items, responsible contact and next action.Identify what must be supplied, reviewed or confirmed before the affected work proceeds.
AGREE THE EVIDENCE

Photographs can support discussion of appearance and location. Dimensions and other acceptance criteria follow the agreed checking methods. Images, inspection records, sample return and other supporting material must be included in the agreed project scope where required.

05 / Preparing the material flow

Define the delivery
before the parts are ready.

Incoming material and processed-part delivery are separate arrangements. Identify each movement and the information needed for its handover.

INBOUND / WHERE MATERIAL IS SUPPLIED

Material for processing.

Confirm the dispatch location, material identity and amount, receiving details and transport responsibilities.

OUTBOUND / PROCESSED PARTS OR SAMPLES

The agreed project output.

Confirm the destination, receiving organization, output format and the documents or records included in the work.

01

Delivery
format

Discuss separated parts, sheets, panels or retained carriers. Confirm pack quantities and their counting basis.

02

Protection &
identification

Identify surfaces, edges, openings and locating features that need protection, together with part and revision labels.

03

Destination &
receiving

Confirm the destination, receiving organization, contact and any applicable receiving requirements.

04

Shipment
arrangements

Agree who arranges transport, how costs are confirmed, the accompanying information and the relevant responsibilities.

Transport method, carrier, shipment documents and customs arrangements are discussed for the actual movement. Confirm the relevant parties and requirements before dispatch; no standard transit time or duty-inclusive service is specified here.

Discuss the intended delivery

06 / From a requested date to an agreed plan

Plan around the
required arrival date.

Share when the parts are needed. The project plan must account for preparation, confirmation and the relevant material movements as well as processing.

  1. 01 / PROJECT STAGE

    Information review

    Resolve missing or conflicting requirements.

  2. 02 / PROJECT STAGE

    Material readiness

    Confirm the actual stock and its availability.

  3. 03 / PROJECT STAGE

    Incoming shipment

    Where needed, agree dispatch and receipt.

  4. 04 / PROJECT STAGE

    Evaluation & confirmation

    Allow for agreed trials, feedback and changes.

  5. 05 / PROJECT STAGE

    Processing

    Arrange the work to the confirmed scope.

  6. 06 / PROJECT STAGE

    Inspection & dispatch

    Complete agreed checks and shipment preparation.

  7. 07 / PROJECT STAGE

    Transit

    Follow the confirmed transport arrangements.

  8. 08 / PROJECT STAGE

    Receipt

    Connect the delivered parts to the agreed references.

A date to discuss.

Processing completion, dispatch and receipt are different milestones. Unresolved requirements, material readiness, feedback and changes can affect the plan. A target arrival date remains a request until the applicable arrangements are confirmed.

Share your target arrival date

Costs to define separately.

The quotation and shipment discussion should identify the work and arrangements included, with any conditions still to be resolved.

Processing · Evaluation · Agreed checks · Packaging · Incoming transport · Outgoing transport · Other applicable charges

Actual amounts, responsibilities and commercial terms are confirmed for the project.

07 / Continuing a regional project

Make the next shipment
easier to define.

Reference the earlier project and current requirements. An unchanged part does not automatically mean the destination, packing or timing is unchanged.

Discuss a repeat shipment

Carry forward.

  • Applicable drawing and material references.
  • The accepted sample reference, where relevant.
  • Confirmed inspection and acceptance requirements.
  • Previous project or order identification.

Check again.

  • This order’s quantity and counting basis.
  • Destination and receiving contacts.
  • Packaging, labels and required records.
  • Target arrival date and any changed requirements.

08 / Before you enquire

Regional project
questions.

Use these answers to prepare the material and delivery discussion. Technical requirements belong with the drawing, stack and agreed processing scope.

Explore the complete FAQ guide
Can I start with drawings before sending material?

Yes. Begin with the drawing, material information and the question you need to resolve. The review establishes whether physical material is needed and what should be arranged before dispatch.

Where should I send evaluation material?

Receiving details are confirmed through the project discussion after the evaluation needs are reviewed. Check the address, contact, quantity and accompanying information before sending anything. Review the sample arrangements.

Can material origin and delivery destination be different?

Specify them separately in the enquiry, including any different organizations or contacts involved. The feasible material flow, responsibilities and shipment arrangements need to be confirmed for the project.

How are sample return and unused material handled?

Agree the intended return or handling of processed samples and remaining material before evaluation. Confirm quantities, destination, transport responsibility and any applicable arrangements.

What information is needed to discuss delivery timing?

Share the destination, required arrival date, material readiness and project stage. The schedule also depends on open technical questions, evaluation and confirmation needs, processing and transport. A requested date is not a confirmed commitment.

What should I confirm for a repeat shipment?

Reference the earlier project and current drawing and material versions. Recheck the quantity, packing, identification, records, receiving details and required arrival date. Prepare the repeat-project information.

PI FILM LASER PROCESSING

Explore the website

Find the information for your PI film project.